Our Projects
Non-Solar | Solar |
---|---|
2013/2014
Provision of Technical Advisory on Sarawak system blackout in 2013 related to Bakun hydroelectric power station generator responses and power station black start process.
2016 Technical Adviser and Local Consultant for 500kV substation (IF) project
2008/14 Provision of consultancy, competent engineer services and advisory services.
2017 Owner’s engineer services for 500kV Interconnection requirements.
2018 Owner’s engineer services for 230kV and 500kV substation projects for Pestech Cambodia Ltd. In Cambodia.
2020 Owner’s Engineer Services for the 500kV Interconnection Facilities and 500kV Transmission Lines
2020 Project supervision and management services for Two (2) NEM Solar PV System in Negeri Sembilan, Malaysia
2020 Technical Advisory Services for a 1MWp NEM Solar PV System and All Ancillary Works in Klang, Selangor, Malaysia |
2016
Consultants, Grid connection requirement for 50MWac solar project until tender bid evaluation.
2018 Owner’s Engineer Services for Kuala Ketil 50MW solar project
2016 – Consultants to 7 bidders on Interconnection Options and performing Power System Studies for bid submission
2017 – PSS Stage 2 Studies Consultants for two (2) 50MWac LSS SPP.
2017 Advisory Services and Design Review on Interconnection Facilities and Connection Facilities [IFCF]
2017 Independent Engineer Services for 3 projects
2017 Owner’s Engineer Services for 1 project
2018 Owner’s engineer services for 132kV Interconnection requirements
2019 Owner’s Engineer services for two (2) projects.
2019 Independent Engineer Services for 3 projects
2019 Independent Technical Advisor SUKUK bond financing
2020 Owner’s Engineer Services for Two (2) LSS developers
2020 Independent Engineer Service for One (1) LSS developer |
Non-Solar |
---|
2018 KTA/ genting malaysia bhd’s 132kv overhead transmission line works at 2018 Owner’s engineer services for 132kV cable tunneling to TNB Interconnections for 2 projects 2018 Consultant 132kV Cable supply for BRCC |
Non-Solar | Solar |
---|---|
2009 Maintenance of the 11kV electrical switchgear of the Financial Park/Complex. 2012 Maintenance of the 11kV electrical switchgear of the Commercial Complex. 2009 Consultancy Services related to investigation, testing and rectification of cable “hot spots” and sheath damage of 11kV cable at the mid-valley. |
2013 To design, procure, erect, test and commission 33kV transmission line from Petronas Gebeng Solar Installation to TNB PMU Gebeng Industry. Also certified Solar plant fit for commercial service. |
Studies | Competent Engineer Services |
---|---|
2012 Provision of technical and advisory services for the review and study of the electrical supply system and future expansion power requirements. 2012 Provision of a comprehensive technical audit and assessment on policies and maintenance procedures of the electrical power system and equipment. 2015 Technical Adviser – Feasibility study of Grid connection requirements. 2017 Pre-feasibility studies for 7 large scale solar sites 2014 Assisted in review of Sabah and Labuan Grid Code document. 2017/2018 Protection Coordination Studies 2018/2019 Grid Code Tests and Model Validation Studies 2018/2019 Power System Studies 2016 Consultants, Feasibility study of Grid connection requirements for 2 large 2016 Consultants, Feasibility study of Grid connection requirements for 2 large 2020 System Losses Study 2020 System Network Charges Study 2020 PSS1 studies for Bidders bid submissions for LSS4 project. |
2009
Provision of 1 st Grade Competent Engineer services for transformer repair works at Lumut Maritine & Pengkalan Substations
2009 Provision of 1 st Grade Competent Engineer services for transformer repair works at Silibin Substation.
2010 Provision of 1 st Grade Competent Engineer services for 500kV transmission line maintenance works Jimah – Lenggeng.
2009/12 Provision of consultancy, training and advisory services. |